AGV System
Work Break structure (Factory)

  • 1.PREPARATION OF SHOP DRAWING

  • 2.APPROVALS : POWDER COLOR / DRAWINGS / DOCUMENTATION

  • 3.PROCUREMENT : ALUMINIUM / GLASS /HARDWARE / POWDER COATING POWDER

  • 4.PROCESS : POWDER COATING / FABRICATION / GLASS PROCESSING

  • 5.PACKAGING / DESPATCH
img
Work Break structure (site)

  • 1.INSTALLATION : OUTER FRAME

  • 2.PROTECTION OF FRAMES

  • 3.INSTALLATION : OUTER FRAME / GLASS

  • 4.INSTALLATION : HARDWARE / WIREMESH

  • 5.FINAL INSPECTION & SEALING OF OPENINGS

img